Coding phase of OTFC Phase Zero (WFPC-2) Pipeline is complete. Testing is complete. The first release of the system supporting WFPC-2 and STIS has been opened for all archive users.
OTFC Pipeline : High-level design document
OTFC Pipeline : Detailed design document
Populating OTFC Reference File Disks (from CDBS deliveries)
BESTSWITCH Requirements/Design Documents
The requirements-gathering phase of the OTFR system is in progress. OTFR Requirements Document